Our Units
Cad Section
In our cad section there are three members.
Software they use Eurocad software and Dizitizer photo machine
Pattern cutter machine band richpeace
Sample Section
In our sample section there are eleven members. Machine they use Flatlock, Overlock, Plane, Backtip, Cinder Lock, cutter, Vertak, Hole button, Snap button.
Sewing Section
In our sewing section there are 143 members.
Total Space 120000 sft.
Production 40000 pcs/per day
Printing Section
In house printing capacity 15000 pcs per day.
Machinery list given below
Stitching, Spots, Gas-Dryer, Auto Heat Press, Printing Table, Color Making, Table Auto Dryer, Spot Wash, Spot Dryer.
Knitting Section
Total Complex Land Area 50000 sft.
Production Area 10000 sft.
Production Capacity (Day) 3.00 ton (Approx).
Sayam Knit Fab. Knitting with Factory Name Knit Express and Knit Radix Ltd Sister Concern of Sayam Knit Fab.
Dyeing Section
Sayam Knit Fab. Dyeing with Factory Name Knit Concern Ltd, Vibgyor Knit Composite Ltd, Pakiza Apparels Ltd and Model D Capital.
Readymade Garments World
Sayam Knit Fab. has the best of technology and the best of manpower working seamlessly to deliver world's best Jersey knitwears.Our manufacturing process has been vertically integrated to facilitate all under lean(5S) process involved in garment manufacture under one roof. This enables usto reduce time in completing our order.
Factory Facilities
Sayam Knit Fab. determined to Provide every facility too their workers. We believe in ensuring good working conditions so that workers can give their best output to fulfill the company goal.
Considering The Provision Of Medical Facility To Our Workers And Staff Under The Prevailing Labor Act We Have Set-Up A Complete Dispensary Supported By A Medical Officer And Trained Nurses. Necessary First Aid, Along With Supply Of Medicines Is Provided From This Dispensary. In The Case Of Long Term Treatments, The Patient Is Shifted To A Better Hospital. Under The Circumstances The Authority Takes Necessary Measures Provides Full Support.
Paying Respect Towards The Religious Sentiment Of Our People One Prayer Rooms For Male Have Been Set Up On The 3th Floor Of The building.
Fire Has Always Proved A Divesting Effect On Human Life. We Maintain This System Completely Within The Frame Work Of International Safety Act. Necessary Fire Fighting Equipment Are Staged In Places Of Emergency To Provide Considerable Support. We Also Maintain A Fire Alarm System Throughout The Project As An Early Warning System And To Receive Additional External Support In Terms Of Requirement.
To Avoid Pollution And Environment Hazard We Have Installed A Water Treatment Plant In The Project. The Waste Water Of The Project Is Stored In A Tank And Purified In A Process Through Use Of Chemicals. Subsequently This Water Is Re-Used In The Project Work Simultaneously. This Is Not Only A Safety Measure But Saving As Well.
A Cargo Lift Has Been Set Up From Ground Floor To 10th Floor To Carry Goods. So That Workers Can Carry Goods Easily.